New Boiler Plant, Wilkes-Barre, PA
Project Overview
Project: Construct New Boiler Plant
Owner: Department of Veterans Affairs
Location: Wilkes-Barre VA Medical Center, Wilkes-Barre, PA
Project Type: New Boiler Plant
Role: Prime Contractor
Greenland was the Construction Manager responsible for constructing a new boiler plant at the Wilkes-Barre VA Medical Center in Wilkes-Barre, PA. The project included replacing three 520 HP water tube boilers, condensate storage tank, DA Tank, water softener, water treatment, and boiler controls with SCADA. A complete replacement of the 2,000 amp electrical switchgear was also included. A building addition to the existing boiler plant was added along with a new control room and plant offices. Site work included pavement, curbs, gutters, and storm drainage. To expedite the project, two 650 HP temporary boilers were installed to allow all of the work to be performed simultaneously without disrupting operations.