Combined Heat & Power Plant, Waco, TX

Project Overview

Project: Combined Heat & Power Plant
Owner: Department of Veterans Affairs
Location: Doris Miller VA Medical Center, Waco, TX
Project Type: New Combined Heat & Power Plant
Role: Prime Contractor

Greenland was the Construction Manager responsible for constructing a new Combined Heat and Power (CHP) plant at the Doris Miller Medical Center in Waco, TX. The project included installing a natural gas fired turbine generator, heat recovery steam generator, and fuel gas compressor. The CHP plant can produce approximately 1.6 MW of electricity and includes steam capacity of approximately 18,500 lbs./hr. The plant includes power metering, data acquisition, computer control equipment, power utility interconnection equipment (transformers, switchgear, protective relays), and associated ancillary materials and equipment. The project also included site civil work, paving, concrete foundations, building structures, permanent steel platforms, stairs, handrails, and ladders.