Fuel Facility Replacement, Columbus, MS

Project Overview

Project: Fuel Facility Replacement
Owner: US Army Corps of Engineers
Location: Columbus Air Force Base, MS
Project Type: Fuel Oil (Aviation); Fuel Facility
Role: MEP Coordinator; Joint Venture

Greenland was the Mechanical, Electrical, and Plumbing Coordinator, to SGJV, LLC (an SDVOSB Joint Venture between SAW Contracting, Inc. and Greenland Enterprises, Inc.), responsible for replacing the fuel facility. The project included the construction of a new fuel facility, which consists of three above-ground, horizontal, double-walled storage tanks (50,000 gallons each) with tank-mounted pumps, a filter separator shelter with receipt and issue filtration, truck fill stands, a truck unload, a product recovery tank, and associated infrastructure. The project also included the replacement of the existing transfer pumps, which are located at the existing bulk fuel facility, along with other related mechanical and electrical modifications.