Project Overview

ENR Award-Winning Project

Project: Thermal Energy Storage

Owner: NC State University

Location: Raleigh, NC

Project Type: Education

Role: General Contractor

Description:

Greenland served as the General Contractor to construct a stratified chilled water thermal energy storage tank (TES) adjacent to the Centennial Campus Central Utility Plant. Scope included all civil, architectural, mechanical, and electrical scope for the 85-foot-tall tank, which holds approximately 3.5 million gallons of water.

The project was named by Engineering News-Record as the Southeast’s Best Project for 2020 in the Energy Industrial category.

Related Articles: