Project Overview

Project: Boiler Plant Upgrade Phase V

Owner: Martinsburg VA Medical Center

Location: Martinsburg, WV

Project Type: Boiler Plant Renovation

Construction Type: Traditional

Description: Greenland was the Construction Manager responsible for renovating the boiler plant at the Martinsburg VA Medical Center in Martinsburg, WV. This project consisted of the complete demolition of all components inside the existing boiler plant, which was built in the 1940s. We had to perform asbestos abatement for all piping insulation and remove/replace the concrete floor and roof. The main portion of the project consisted of removing all mechanical items from the plant and replacing them with new. This included three 700 HP firetube boilers, DA tank and pumps, condensate tank and pumps, condensate polisher, blowdown tank, all new steam piping, and all new boiler controls to include a SCADA workstation. This project also included two 900 HP rental boilers to keep the hospital supplied with steam during construction, which required a critical shutdown to tie into the steam system.